Muliti-Skilled in May.

What an adaptable Multi-Skilled team we have here. Breaking out these reinforced hight density concrete plinths is not only labour intensive, its also physically demanding too. The teams have elected to work in half hour shifts on the plinths.

Both the engineering team and the electrical team have joined forces with the building team to make best use of the hired equipment. While the engineering team and the electrical team members are wating their turn they are busy scraping and preparing the walls of the 1960’s building for a fresh coat of paint.

What a super community project where everyone learns, and everyone wins.

Engineers decorating

About morturn

Historian – Photographer – Filmmaker Retired construction professional with a passion for public, social and industrial history. I believe in equality, dignity and integrity for all. Don’t like people who try to belittle the ambitions of others. I am of the opinion that my now life belongs to the whole community and as long as I live, it is my privilege to do for it whatever I can. I want to be thoroughly used up when I die, for the harder I work the more I live.
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s